EPCC provides comprehensive and cost effective total Scrubber solutions from our partner brand from Korea that cover the entire process of choosing and installation. The stages include system selection, survey & 3D scanning, engineering, procurement, installation, commissioning and training.

​

NO DRY DOCK REQUIRED

MAX 1-2 WEEK IDLE TIME

​

1) Minimized commercial loss:

​Initial fitting work can be done while vessel is on service (voyage) and drydocking is not required for final assembly due to no modification of hull of sea suction valve, over board valves and sea chests.

​

2) Customized system for vessel:

​System utilizes existing ship systems to run the scrubbers, minimal work is done to redirect existing ship resources to the scrubber system.

​

3) High quality material and reliable sensors:

​High quality material of scrubber chamber and sensors  from  recognized  makers  to  constantly monitor the inflow and outflow of exhaust gases..

​

4) Best delivery time:

​Parts fully ready within 4 months (EXWORK) from the order date + Delivery + 3 weeks retrofit (max).

​

5) Turn key solution:

​Global Echo provides turn key solution for retrofitting of the scrubber systems.e

​

6) Cost (Energy) saving / OPEX:

​MS-SOx is designed for saving energy.

  • -Require less Seawater

  • Less Pump power

  • Low FOC

​

7) Saving DWT:

​For Suezmax Class, total weight of scrubber system is about 30 ton including piping.